Drilling and Rig Equipment | UPDATED
Summary
A wide range of equipment is used during drilling. In this module learners will gain an understanding in the critical pieces of rig and third party equipment used during drilling.
Sub-modules include:
- Rig Structure
- Hoisting System
- Power System
- Circulating System
- Well Control System
- Secondary Rig Equipment
- Third Party Equipment
Learning outcomes
- Can describe the main systems in use on the drilling rig, their purpose, design considerations and operational constraints
- Can describe the secondary rig equipment and third party equipment required on the rig for various operations
Related modules
-
Well Examination and Verification Drilling & Completions
$50.0040 minutes -
Waste Management Drilling & Completions
$50.001 hour -
Drilling & Completions Collection Drilling & Completions
$450.0028.3 hours